The Town of Nederland Planning and Zoning Department is eager to help the community with your building and permitting needs. Here, you will find information on building permits, as well as links to guides that will help you navigate the building process in Nederland.
If you have questions that can't be answered here, or would rather just talk to someone in person, please Contact Us. Depending on your need, it may be necessary to schedule an appointment.
The Town of Nederland is governed under the 2018 ICC codes, with 2024 National Electrical Code (NEC) in effect.
Permit Turnaround Times
Permit Type |
Timeframe for Turnaround |
|
One Stop Permitting Sign Permits Addressing Permits Land Use Permits |
3 Business Days 5 Business Days 5 Business Days 10 Business Days |
Permits will be stamped with the date and time received and processed in the order in which they are received.
How-To Guides
How-to guides are regularly being developed and revised to assist applicants through the Building and Land Use process. Below, you'll find links to the most recent editions of all our building guides:
Finding Zoning, Yard and Buld Requirements, and Allowable Uses Right-of-Way/Excavation/Blasting
Determining Passive Solar Site Orientation Starting a New Business in Nederland
New Construction Applicant Guide New Water and Sewer Service Checklist
All contractors doing work within the Town of Nederland must have an active Nederland Contractor License.
If you do not have an active contractor license, please click the following link to download the Contractors License Application.
Building Permits will NOT be issued without and active Contractors License.
All building and construction projects, including those done by homeowners, must be permitted by the Town of Nederland. Property owners bear the responsibility of ensuring that hired contractors pull appropriate permits for work to be done. The Nederland Municipal Code provides general guidance for project managers and contractors. Chapter 18 concerns building regulations, and Chapter 16 concerns zoning. Please be aware that all permit fees can be doubled without a required permit.
The Town of Nederland processes all building permit applications via electronic submission. SAFEbuilt, Colorado is contracted by the Town of Nederland for plan review and inspection services. Kyley Flynn is the Chief Building Official.
One-Stop Building Permits
The One-Stop Building Permit Application is used for common improvements, such as:
- Electrical Service Changes
- Exterior Siding
- Furnace Replacements
- Replacement Doors/Windows
- Reroofs
- Replacement Water Heaters
One-Stop permits can often be processed in the same day. The same form can be used for Miscellaneous projects as well, such as:
- Demolitions
- Solar PV
- Retaining Walls over 4 ft
- Temporary/Accessory Structures (needs to be accompanies by associated plans to be reviewed via SAFEbuilt Plan Review)
Please submit your One-Stop or Miscellaneous applications to Town Hall or by email to the Community Planner.
New Residential or Commercial Construction Permits
Wildfire Mitigation Plan
With the adoption of the 2018 Building Codes, the Town of Nederland is now requiring defensible space on all new or remodeled buildings - both residential and commercial.
Please complete this form and submit it to the Nederland Fire Protection District for review and approval at: inspections@nfpd.org.
All new residential/commercial projects, projects being built on sensitive land, or any renovations of 20% alteration or more are required to meet for a Concept Review/Site Plan Review with Town staff prior to applying for a permit. This review has a $250 non-refundable fee, with a $1,000 engineering/legal escrow deposit required for residential projects. For commercial projects, submit $1,500 escrow for properties under 1 acre in size, or $2,000 for properties over 1 acre in size. The remainder of deposit minus engineering/legal review costs will be returned to the applicant when the building process is completed.
Please complete the standard building permit to being the permitting process. Please note that new builds will require a survey which can be used to create a site plan for either residential or commercial construction, which must be no older than 5 years from survey date. An Improvement Location Certificate (ILC) is acceptable for minimal development (i.e. renovation), however any change to building footprint will require a survey. Please be aware that if there is any question of property boundary lines or encroachment, a survey will be required.
Prior to design of your project, please review NMC Sec. 16-33 Yard and Bulk Requirements to determine required setbacks, allowable maximum lot coverage, and building heights by zoning district.
The Town staff request that within the building process, a project representative (owner, builder, designer) be designated as the point-of-contact regarding the project to streamline communication. This representative will be contacted when the permit is ready to issue, or more information is needed. If you have not received a response within 7 business days, please Contact Us.
Residential & Commercial Plans Checklists
Please submit a completed checklist along with your building permit for any new residential or commercial development or significant renovation project to expedite your building permit submission. To expedite the review process, please submit 2 copies of paper plans along with .pdf files of these plans.
Project-Specific Information
Construction Best Management Practices
Building Inspections
SAFEbuilt Colorado provides all building department services for the Town of Nederland. To schedule a building inspection with SAFEbuilt on an approved permit, please call (303) 450-8748.